Show/Hide
The City of Albertville is taking the following precautionary methods in light of the COVID-19 situation: Spring recreation sports will be delayed until at least April 6th. Sand Mountain Park staff will be available to answer any questions for membership, program sport participants, and coaches via 256-891-8240, and will remain open to the public, for now, at the Armory. Albertville Public Library and Albertville Senior Center will be closed through at least April 6th. Per Alabama Supreme Court, Albertville Municipal Court will be cancelled March 17th through April 16th. Please contact the Magistrate's Office for your updated court date at 256-891-8291. The Magistrate's office will be closed to the public, but will take payments and handle business through their drive-up window. The Magistrate's lobby will only remain open for warrants. City Hall will remain open to the public during normal business hours. Please contact us at 256-891-8200 with any questions or concerns. 

STREET & PAVEMENT MAINTENANCE

Print
Press Enter to show all options, press Tab go to next option

**Fall-Winter Leaf Service Truck Runs from November 1-February 1; Please be sure when sweeping leaves to the streets that you are aware of curb gutters so as to not clog. Leaves are to be bagged at placed at the street all other months**

 

STREET

The Department is responsible for cleaning and sweeping the City’s streets. The street sweepers are in operation on a seasonal basis. In the spring, city streets are swept several times to clean off the accumulation of debris from the winter months The City’s arterial and collector streets are swept on a monthly basis in the spring and fall. During the summer months, streets are scheduled for sweeping about every six weeks allowing residential to be cleaned every 6-8 weeks throughout the year. 

To request street sweeping services, due to things such as broken glass or debris in the roadway, please submit an email to Public Services or call 256.891.8250.

PAVEMENT

The Public Services Department is responsible for the maintenance of city roadways in Albertville. The repairs to city streets consist mainly of full depth concrete patching and asphalt overlays.

Scheduled repairs to city streets are prioritized based upon traffic volumes and level of infrastructure deterioration.  Employees within the Department perform street maintenance and repair projects during seasonal months which typically run from March to November. If you see a section of pavement that is in need of repair, please submit a citizen request to the Department. 

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer